{"id":1083,"date":"2026-11-24T08:36:03","date_gmt":"2026-11-24T08:36:03","guid":{"rendered":"https:\/\/solardepot.co.id\/?p=1083"},"modified":"2026-11-27T02:59:16","modified_gmt":"2026-11-27T02:59:16","slug":"peak-shaving-with-bess","status":"publish","type":"post","link":"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/","title":{"rendered":"How Peak Shaving Works with a BESS: Cutting Factory Electricity Bills During the Peak Load Period (WBP)"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">A Battery Energy Storage System (BESS) helps factories reduce their electricity bills through peak shaving: storing electrical energy when demand and tariffs are lower, then discharging it during the peak load period (<em>Waktu Beban Puncak<\/em>, or WBP). This mechanism allows a BESS to reduce the amount of power a factory draws from the PLN grid when its consumption rises, which helps to lower electricity costs without scaling back production.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In industrial operations, equipment such as production machinery, compressors, chillers and automation systems needs a continuous supply of electricity. When everything runs at the same time, energy consumption climbs and the electrical load rises, particularly during the WBP.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This is where a BESS comes in. As an energy storage system, it helps manage the timing of electricity use more efficiently. The stored energy can support the factory\u2019s operations when the load increases, reducing dependence on grid supply during that period.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This article explains how peak shaving works with a BESS, walks through a simulation of potential electricity cost savings, and sets out the factors to consider when determining battery capacity for industrial needs.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Understanding Peak Shaving and the Peak Load Period<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>What is peak shaving?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Peak shaving is an energy management strategy for \u201cshaving off\u201d the peaks in the power drawn from the grid. When a factory\u2019s power demand surges, part of the load is supplied from another source, in this case batteries, so that the power drawn from PLN stays below a limit that we define. The result is a load curve that was once jagged, with sharp peaks, becoming noticeably flatter.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>WBP and LWBP: what is the difference?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">PLN divides the time of use for certain industrial customers into two blocks:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 &nbsp; &nbsp; &nbsp; <strong>Peak Load Period (WBP):<\/strong> known in Indonesian as <em>Waktu Beban Puncak<\/em>, this is the period when electricity use is high, generally in the evening at around 18:00\u201322:00, when many appliances are in use at the same time (the exact hours follow PLN\u2019s rules and your region). Tariffs are higher, set as a multiple of the base tariff.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 &nbsp; &nbsp; &nbsp; <strong>Off-Peak Period (LWBP):<\/strong> known in Indonesian as <em>Luar Waktu Beban Puncak<\/em>, this is all the time outside the WBP. Tariffs are lower.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Put simply, during peak load hours, every kWh you draw costs more than it does in the daytime or in the early hours of the morning.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Why do power surges affect costs?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">There are two layers of cost, and they stack. First, energy consumed during the WBP is charged at a higher tariff. Second, depending on your tariff class and contracted capacity, power surges can also affect the demand-related charge, the risk of exceeding your contracted capacity, and the capacity you are required to pay for. A single brief surge, such as several large motors starting at once, can determine the figure on an entire month\u2019s bill. That is why controlling the peak is often more valuable than simply reducing average consumption.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>What Is a BESS and How Does It Work?<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A <em>Battery Energy Storage System<\/em> (BESS) is a system that stores electrical energy in batteries, usually lithium-ion. Put simply, a BESS works like a store of electricity that can be drawn on again whenever it is needed. It allows surplus energy to be stored when electricity generation is high and then used again when demand rises.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In an industrial power system, a BESS plays an important role in balancing supply and demand. The technology also supports the use of renewable energy such as <a href=\"https:\/\/solardepot.co.id\/panel-surya\/\">solar<\/a> and wind, whose output fluctuates with the weather. With a BESS, the energy generated when the sun is shining or the wind is blowing strongly does not all have to be used immediately; it can be stored to meet electricity needs at other times.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In essence, a BESS works through two main processes: charging and discharging. When electricity is available in surplus or the tariff is lower, the batteries store that energy. Conversely, when demand rises or supply falls, the batteries release energy for use by the factory\u2019s equipment and operations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To make this process safe and efficient, a BESS relies on several main components:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">1.&nbsp; &nbsp; <strong>Batteries.<\/strong> These store electrical energy so that it can be used again later. In industrial applications, lithium-ion batteries, particularly LFP (<em>Lithium Iron Phosphate<\/em>), are widely used because of their long cycle life and good safety characteristics.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2.&nbsp; &nbsp; <strong>Battery Management System (BMS).<\/strong> This can be thought of as the batteries\u2019 supervisory system. The BMS monitors the voltage, current and temperature of every battery cell to ensure that charging and discharging stay within safe limits.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3.&nbsp; &nbsp; <strong>Power Conversion System (PCS).<\/strong> This converts electrical energy between alternating current (AC) and direct current (DC). It allows electricity from the grid to be used to charge the batteries, and energy from the batteries to be fed back into the factory\u2019s electrical system.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">4.&nbsp; &nbsp; <strong>Energy Management System (EMS).<\/strong> This decides when the batteries should charge or discharge, based on supply conditions, electricity demand and the energy-use strategy. It helps the system operate optimally for the factory\u2019s operational needs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Together, these components mean that a BESS is not merely a place to store electricity; it also helps a company manage its energy use more flexibly, especially when a factory\u2019s demand changes throughout the day.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>How a BESS Reduces Peak Load<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">In industrial operations, electricity demand is not constant throughout the day. During certain periods, particularly the peak load period (<em>Waktu Beban Puncak<\/em>, or WBP), a factory\u2019s consumption can climb and push energy costs higher. This is where the <em>Battery Energy Storage System<\/em> (BESS) comes in.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A BESS helps a company manage its electricity use by storing energy when tariffs are lower or when supply is plentiful, then using it again when demand rises. With this strategy, part of the factory\u2019s power demand can be met from the batteries, so the electricity drawn from the PLN grid can be reduced during the peak period.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In practice, using a BESS to reduce peak load unfolds in four stages:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">1.&nbsp; &nbsp; <strong>Charge the batteries during the LWBP<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The BESS stores energy when electricity tariffs are lower or when there is surplus energy from the solar PV system (PLTS).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2.&nbsp; &nbsp; <strong>Use the stored energy during the WBP<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The batteries supply part of the factory\u2019s electricity demand when the load rises.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3.&nbsp; &nbsp; <strong>Reduce grid electricity use<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Supply from the batteries reduces the power drawn from the PLN grid during peak hours.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">4.&nbsp; &nbsp; <strong>Automatic control by the EMS<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The EMS manages charging and discharging based on the load profile and the power limit that has been set.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The whole process can run automatically through the <em>Energy Management System<\/em> (EMS), based on the consumption profile and the power limit that has been set. This means a company does not need to manage charging and discharging manually every day. With proper management, a BESS can help optimise electricity costs while safeguarding the factory\u2019s power needs throughout its operations.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Simulation: Factory Electricity Cost Savings<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Note:<\/strong> the figures below are purely illustrative, to aid understanding. Tariffs, contracted capacity and load patterns differ from one factory to the next, so real results must be calculated from your own data.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Consumption profile before the BESS<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Imagine a factory with a base load of around 600 kW for most of its operating hours, rising to 1,000 kW during a four-hour WBP (for example, because a night shift and heating processes are running at the same time).<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Condition<\/strong><\/td><td><strong>Grid power during the WBP<\/strong><\/td><td><strong>Grid energy during the WBP (4 hours)<\/strong><\/td><\/tr><tr><td>Before the BESS<\/td><td>1,000 kW<\/td><td>4,000 kWh<\/td><\/tr><tr><td>After the BESS (700 kW limit)<\/td><td>700 kW<\/td><td>2,800 kWh<\/td><\/tr><tr><td>Supplied by the batteries<\/td><td>300 kW<\/td><td>1,200 kWh<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Daily cost calculation<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Suppose the LWBP tariff is Rp1,100\/kWh and the WBP tariff is 1.5 times the LWBP rate, or Rp1,650\/kWh, with a system round-trip efficiency of around 90%.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 &nbsp; &nbsp; &nbsp; The 1,200 kWh shifted out of the WBP is worth: 1,200 \u00d7 Rp1,650 = <strong>Rp1,980,000<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 &nbsp; &nbsp; &nbsp; To supply 1,200 kWh, the batteries need to be charged with about 1,333 kWh during the LWBP: 1,333 \u00d7 Rp1,100 \u2248 <strong>Rp1,466,000<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 &nbsp; &nbsp; &nbsp; The net saving is \u2248 <strong>Rp514,000 per day<\/strong>, or roughly <strong>Rp13 million per month<\/strong> over 26 operating days.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This figure reflects only the difference in energy tariffs. If your tariff class also carries charges linked to power demand, reducing the peak from 1,000 kW to 700 kW could deliver additional savings.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Factors that affect the results<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 &nbsp; &nbsp; &nbsp; <strong>The gap between WBP and LWBP tariffs.<\/strong> The wider the gap, the larger the savings margin.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 &nbsp; &nbsp; &nbsp; <strong>System efficiency.<\/strong> Some energy is lost whenever the batteries are charged and discharged. The less that is lost, the greater the savings.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 &nbsp; &nbsp; &nbsp; <strong>Battery charging cost.<\/strong> If the batteries are charged from your own solar PV system, the energy costs far less than grid electricity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 &nbsp; &nbsp; &nbsp; <strong>Load pattern.<\/strong> A sharp, short peak is much easier to shave than a high load that stays constant throughout the day.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 &nbsp; &nbsp; &nbsp; <strong>Battery capacity relative to the reduction target.<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Determining BESS Capacity for Industrial Needs<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">This is the part that most often determines whether a project succeeds. A battery that is too small cannot shave the peak; one that is too large makes the investment hard to pay back. The steps we follow are:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">1.&nbsp; &nbsp; <strong>Analyse the consumption data.<\/strong> Collect load data at 15-minute or hourly intervals for at least several months, then examine the daily load curve: when the peak occurs, how high it is and how long it lasts.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2.&nbsp; &nbsp; <strong>Set the reduction target.<\/strong> For example, bring the peak down from 1,000 kW to 700 kW. The difference determines the <strong>power rating (kW)<\/strong> that the PCS must be able to deliver.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3.&nbsp; &nbsp; <strong>Calculate the energy requirement (kWh).<\/strong> The area above the limit line on the load curve is the energy that the batteries must supply. In the example above: 300 kW \u00d7 4 hours = 1,200 kWh.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">4.&nbsp; &nbsp; <strong>Account for WBP duration, depth of discharge (DoD) and efficiency.<\/strong> The nominal battery capacity must be larger than the energy requirement because batteries are not discharged to 100%. With a DoD of 90% and a system efficiency of 90%, the nominal capacity required is roughly 1,300 to 1,500 kWh, not 1,200 kWh.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">5.&nbsp; &nbsp; <strong>Match the budget and the target.<\/strong> Shaving 100% of the peak is sometimes uneconomic. Shaving only the sharpest part of the peak often gives the best benefit-to-cost ratio.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Benefits and Challenges of Implementation<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Benefits<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 &nbsp; &nbsp; &nbsp; <strong>More controllable electricity costs.<\/strong> Shaving the peak means less expensive energy is purchased. For many factories, this is a way to cut the electricity bill without disrupting the production schedule.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 &nbsp; &nbsp; &nbsp; <strong>More controllable power surges<\/strong>, which lowers the risk of overload.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 &nbsp; &nbsp; &nbsp; <strong>More stable operational supply.<\/strong> The batteries can act as a buffer when grid voltage is less than ideal.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Challenges<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 &nbsp; &nbsp; &nbsp; <strong>Upfront investment.<\/strong> This is the largest cost in the project, so an honest economic simulation is needed rather than a rough estimate.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 &nbsp; &nbsp; &nbsp; <strong>Battery life.<\/strong> This is measured in cycles and years. Usage patterns, ambient temperature and the quality of the BMS all have a significant influence.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 &nbsp; &nbsp; &nbsp; <strong>Maintenance.<\/strong> Cooling, connection checks and software updates still need to be scheduled.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 &nbsp; &nbsp; &nbsp; <strong>Control and monitoring systems.<\/strong> Without a good EMS and regular energy monitoring, the system will not perform as designed. The threshold needs to be reviewed whenever production patterns change.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>FAQ: Using a BESS to Reduce Peak Load<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Can a BESS be used for peak shaving without a solar PV system?<\/strong><strong><br><\/strong> Yes. A BESS can be charged from the PLN grid during the LWBP and then discharged during the WBP. The savings come from the tariff difference and from shaving the peak. When it is paired with solar PV, charging costs can be lower and the benefits are usually greater, but a solar PV system is not essential.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>How long can a BESS supply electricity during the WBP?<\/strong><strong><br><\/strong> It depends on the energy capacity (kWh) and the amount of power being shaved (kW). For example, a battery with 1,200 kWh of usable capacity discharging 300 kW can last about four hours. That is why the system is designed around the duration of your WBP and your reduction target.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Can peak load reduction lower the electricity bill while also avoiding overload?<\/strong><strong><br><\/strong> Yes, both can be achieved at the same time, because the power drawn from the grid is kept below the limit that has been set. The size of the savings still depends on your tariff class, contracted capacity and the factory\u2019s load pattern.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Conclusion<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">At its core, a BESS works simply: it charges when electricity is cheap and discharges when the load peaks, so the factory draws less power from the grid when it is most expensive. Well-designed peak load reduction flattens the load curve and keeps the electricity bill under better control.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The results, however, depend heavily on data. A load profile analysis and an economic simulation must be carried out before system capacity is determined, so that the investment is well targeted and neither oversized nor undersized.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As a company with long experience in the solar energy and energy storage industry, we are ready to help, from reading your factory\u2019s electricity consumption data and simulating the savings to designing an energy storage solution that fits your industrial needs. If you are looking for a measurable way to cut your electricity bill, speak to our team at <a href=\"https:\/\/solardepot.co.id\/\">Solar Depot<\/a> first.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A Battery Energy Storage System (BESS) helps factories reduce their electricity bills through peak shaving: storing electrical energy when demand and tariffs are lower, then discharging it during the peak load period (Waktu Beban Puncak, or WBP). This mechanism allows a BESS to reduce the amount of power a factory draws from the PLN grid [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":1059,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[116,115,118],"class_list":["post-1083","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-bess","tag-peak-shaving","tag-peal-load-period"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>How Peak Shaving Works with a BESS: Cutting Factory Electricity Bills During the Peak Load Period (WBP) - Solar Depot<\/title>\n<meta name=\"description\" content=\"Learn how peak shaving with a BESS reduces grid power use during the WBP, lowers energy costs and optimises factory operations.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How Peak Shaving Works with a BESS: Cutting Factory Electricity Bills During the Peak Load Period (WBP) - Solar Depot\" \/>\n<meta property=\"og:description\" content=\"Learn how peak shaving with a BESS reduces grid power use during the WBP, lowers energy costs and optimises factory operations.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/\" \/>\n<meta property=\"og:site_name\" content=\"Solar Depot\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-24T08:36:03+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-27T02:59:16+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/solardepot.co.id\/wp-content\/uploads\/2026\/11\/5ec61ec2ccfa3d1d4ab951b2225889d0.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Marketing ATW Solar\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Marketing ATW Solar\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/\"},\"author\":{\"name\":\"Marketing ATW Solar\",\"@id\":\"https:\/\/solardepot.co.id\/en\/#\/schema\/person\/8332c2a887af16593d058d4f3db27640\"},\"headline\":\"How Peak Shaving Works with a BESS: Cutting Factory Electricity Bills During the Peak Load Period (WBP)\",\"datePublished\":\"2026-11-24T08:36:03+00:00\",\"dateModified\":\"2026-11-27T02:59:16+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/\"},\"wordCount\":2255,\"publisher\":{\"@id\":\"https:\/\/solardepot.co.id\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/solardepot.co.id\/wp-content\/uploads\/2026\/11\/5ec61ec2ccfa3d1d4ab951b2225889d0.jpg\",\"keywords\":[\"BESS\",\"Peak Shaving\",\"Peal Load Period\"],\"articleSection\":[\"Blog\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/\",\"url\":\"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/\",\"name\":\"How Peak Shaving Works with a BESS: Cutting Factory Electricity Bills During the Peak Load Period (WBP) - Solar Depot\",\"isPartOf\":{\"@id\":\"https:\/\/solardepot.co.id\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/solardepot.co.id\/wp-content\/uploads\/2026\/11\/5ec61ec2ccfa3d1d4ab951b2225889d0.jpg\",\"datePublished\":\"2026-11-24T08:36:03+00:00\",\"dateModified\":\"2026-11-27T02:59:16+00:00\",\"description\":\"Learn how peak shaving with a BESS reduces grid power use during the WBP, lowers energy costs and optimises factory operations.\",\"breadcrumb\":{\"@id\":\"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/#primaryimage\",\"url\":\"https:\/\/solardepot.co.id\/wp-content\/uploads\/2026\/11\/5ec61ec2ccfa3d1d4ab951b2225889d0.jpg\",\"contentUrl\":\"https:\/\/solardepot.co.id\/wp-content\/uploads\/2026\/11\/5ec61ec2ccfa3d1d4ab951b2225889d0.jpg\",\"width\":1024,\"height\":1024},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Beranda\",\"item\":\"https:\/\/solardepot.co.id\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How Peak Shaving Works with a BESS: Cutting Factory Electricity Bills During the Peak Load Period (WBP)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/solardepot.co.id\/en\/#website\",\"url\":\"https:\/\/solardepot.co.id\/en\/\",\"name\":\"Solar Depot\",\"description\":\"Solar Depot\",\"publisher\":{\"@id\":\"https:\/\/solardepot.co.id\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/solardepot.co.id\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/solardepot.co.id\/en\/#organization\",\"name\":\"Solar Depot\",\"url\":\"https:\/\/solardepot.co.id\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/solardepot.co.id\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/solardepot.co.id\/wp-content\/uploads\/2025\/12\/favicon.png\",\"contentUrl\":\"https:\/\/solardepot.co.id\/wp-content\/uploads\/2025\/12\/favicon.png\",\"width\":150,\"height\":150,\"caption\":\"Solar Depot\"},\"image\":{\"@id\":\"https:\/\/solardepot.co.id\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/solardepot.co.id\/en\/#\/schema\/person\/8332c2a887af16593d058d4f3db27640\",\"name\":\"Marketing ATW Solar\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/solardepot.co.id\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/cbda107fb9440d72da73931a24d6cc0d4e6eee1c0768ac27010c7233cda162e3?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/cbda107fb9440d72da73931a24d6cc0d4e6eee1c0768ac27010c7233cda162e3?s=96&d=mm&r=g\",\"caption\":\"Marketing ATW Solar\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How Peak Shaving Works with a BESS: Cutting Factory Electricity Bills During the Peak Load Period (WBP) - Solar Depot","description":"Learn how peak shaving with a BESS reduces grid power use during the WBP, lowers energy costs and optimises factory operations.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/","og_locale":"en_US","og_type":"article","og_title":"How Peak Shaving Works with a BESS: Cutting Factory Electricity Bills During the Peak Load Period (WBP) - Solar Depot","og_description":"Learn how peak shaving with a BESS reduces grid power use during the WBP, lowers energy costs and optimises factory operations.","og_url":"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/","og_site_name":"Solar Depot","article_published_time":"2026-11-24T08:36:03+00:00","article_modified_time":"2026-11-27T02:59:16+00:00","og_image":[{"width":1024,"height":1024,"url":"https:\/\/solardepot.co.id\/wp-content\/uploads\/2026\/11\/5ec61ec2ccfa3d1d4ab951b2225889d0.jpg","type":"image\/jpeg"}],"author":"Marketing ATW Solar","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Marketing ATW Solar","Est. reading time":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/#article","isPartOf":{"@id":"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/"},"author":{"name":"Marketing ATW Solar","@id":"https:\/\/solardepot.co.id\/en\/#\/schema\/person\/8332c2a887af16593d058d4f3db27640"},"headline":"How Peak Shaving Works with a BESS: Cutting Factory Electricity Bills During the Peak Load Period (WBP)","datePublished":"2026-11-24T08:36:03+00:00","dateModified":"2026-11-27T02:59:16+00:00","mainEntityOfPage":{"@id":"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/"},"wordCount":2255,"publisher":{"@id":"https:\/\/solardepot.co.id\/en\/#organization"},"image":{"@id":"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/#primaryimage"},"thumbnailUrl":"https:\/\/solardepot.co.id\/wp-content\/uploads\/2026\/11\/5ec61ec2ccfa3d1d4ab951b2225889d0.jpg","keywords":["BESS","Peak Shaving","Peal Load Period"],"articleSection":["Blog"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/","url":"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/","name":"How Peak Shaving Works with a BESS: Cutting Factory Electricity Bills During the Peak Load Period (WBP) - Solar Depot","isPartOf":{"@id":"https:\/\/solardepot.co.id\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/#primaryimage"},"image":{"@id":"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/#primaryimage"},"thumbnailUrl":"https:\/\/solardepot.co.id\/wp-content\/uploads\/2026\/11\/5ec61ec2ccfa3d1d4ab951b2225889d0.jpg","datePublished":"2026-11-24T08:36:03+00:00","dateModified":"2026-11-27T02:59:16+00:00","description":"Learn how peak shaving with a BESS reduces grid power use during the WBP, lowers energy costs and optimises factory operations.","breadcrumb":{"@id":"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/#primaryimage","url":"https:\/\/solardepot.co.id\/wp-content\/uploads\/2026\/11\/5ec61ec2ccfa3d1d4ab951b2225889d0.jpg","contentUrl":"https:\/\/solardepot.co.id\/wp-content\/uploads\/2026\/11\/5ec61ec2ccfa3d1d4ab951b2225889d0.jpg","width":1024,"height":1024},{"@type":"BreadcrumbList","@id":"https:\/\/solardepot.co.id\/en\/blog\/peak-shaving-with-bess\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Beranda","item":"https:\/\/solardepot.co.id\/en\/"},{"@type":"ListItem","position":2,"name":"How Peak Shaving Works with a BESS: Cutting Factory Electricity Bills During the Peak Load Period (WBP)"}]},{"@type":"WebSite","@id":"https:\/\/solardepot.co.id\/en\/#website","url":"https:\/\/solardepot.co.id\/en\/","name":"Solar Depot","description":"Solar Depot","publisher":{"@id":"https:\/\/solardepot.co.id\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/solardepot.co.id\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/solardepot.co.id\/en\/#organization","name":"Solar Depot","url":"https:\/\/solardepot.co.id\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/solardepot.co.id\/en\/#\/schema\/logo\/image\/","url":"https:\/\/solardepot.co.id\/wp-content\/uploads\/2025\/12\/favicon.png","contentUrl":"https:\/\/solardepot.co.id\/wp-content\/uploads\/2025\/12\/favicon.png","width":150,"height":150,"caption":"Solar Depot"},"image":{"@id":"https:\/\/solardepot.co.id\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/solardepot.co.id\/en\/#\/schema\/person\/8332c2a887af16593d058d4f3db27640","name":"Marketing ATW Solar","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/solardepot.co.id\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/cbda107fb9440d72da73931a24d6cc0d4e6eee1c0768ac27010c7233cda162e3?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/cbda107fb9440d72da73931a24d6cc0d4e6eee1c0768ac27010c7233cda162e3?s=96&d=mm&r=g","caption":"Marketing ATW Solar"}}]}},"_links":{"self":[{"href":"https:\/\/solardepot.co.id\/en\/wp-json\/wp\/v2\/posts\/1083","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/solardepot.co.id\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/solardepot.co.id\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/solardepot.co.id\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/solardepot.co.id\/en\/wp-json\/wp\/v2\/comments?post=1083"}],"version-history":[{"count":1,"href":"https:\/\/solardepot.co.id\/en\/wp-json\/wp\/v2\/posts\/1083\/revisions"}],"predecessor-version":[{"id":1084,"href":"https:\/\/solardepot.co.id\/en\/wp-json\/wp\/v2\/posts\/1083\/revisions\/1084"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/solardepot.co.id\/en\/wp-json\/wp\/v2\/media\/1059"}],"wp:attachment":[{"href":"https:\/\/solardepot.co.id\/en\/wp-json\/wp\/v2\/media?parent=1083"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/solardepot.co.id\/en\/wp-json\/wp\/v2\/categories?post=1083"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/solardepot.co.id\/en\/wp-json\/wp\/v2\/tags?post=1083"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}